Development Plan

Phase 1
(2021)
By mid-2021, install a 2 MT per day automated demonstration fodder unit in Nimr using retreated waste water:
-
Sell 2 MTs of fodder per day to: Dhofar Cattle Feed Co. at approximately $110/ MT and test on a subset of their dairy cows and cattle
-
Prove temperature-controlled production capacity and consistency
-
Prove quality fodder over the duration of the demonstration
-
Prove treatment technologies to provide safe water from the Nimr Water Treatment Facility
Operate demonstration unit for 6 months before beginning construction of full-scale operations in Phase 2




Phase 2
(2022-2027)
Install a 1,000 MT per day high quality fodder units at: Dhofar Cattle Feed Co. in Thumrait.
The 1000 MT fodder unit will:
-
Produce consistent high-quality fodder on-site at each livestock location. Harvest and distribution costs are minimized
-
Operate year-round with no influence from unpredictable rainfall or adverse weather
-
Improve health of livestock herds
-
Provide positive cash flow within first few months of operation






Phase 3

Construct a 210 km water transmission pipeline that will transport up to 20,000 cubic meters per day from the Nimr Water Treatment Facility to cattle operations in Thumrait.
Install a high-capacity desalination system at Nimr to provide secondary re-treatment of water that is currently wasted (evaporated) at the Nimr site.
The water transmission pipeline will:
-
Provide an almost inexhaustible supply of clean water
-
Operate year-round with no influence from unpredictable rainfall or adverse weather
-
Allow for expansion of fodder production that would otherwise be limited based on available water supply
-
The Nimr Water Treatment Facility currently treats 175,000 cubic meters per day. Additional pipelines and desalination systems may be developed to further expand to other locations