Development Plan

Phase 1
(2022-2027)

Install a 1,000 MT per day high quality fodder units at: Dhofar Cattle Feed Co. in Thumrait.

The 1000 MT fodder unit will:

  • Produce consistent high-quality fodder on-site at each livestock location.  Harvest and distribution costs are minimized 

  • Operate year-round with no influence from unpredictable rainfall or adverse weather

  • Improve health of livestock herds 

  • Provide positive cash flow within first few months of operation

phase2-updated_edited.png
phase1-updated_edited.png
phase2-updated.png
phase2-updated.png
phase1-updated_edited.png
phase1-updated_edited.png

Phase 2

Construct a 210 km water transmission pipeline that will transport up to 20,000 cubic meters per day from the Nimr Water Treatment Facility to cattle operations in Thumrait (Al Bashayer, Dhofar Cattle, and other major operations).
Install a high-capacity desalination system at Nimr to provide treatment of water that is currently wasted (evaporated) at the Nimr site.


The water transmission pipeline will:

  • Provide an almost inexhaustible supply of clean water

  • Operate year-round with no influence from unpredictable rainfall or adverse weather

  • Allow for expansion of fodder production that would otherwise be limited based on available water supply

  • The Nimr Water Treatment Facility currently treats 175,000 cubic meters per day. Additional pipelines and desalination systems may be developed to further expand to other locations